Conflicts in the planning processes of Locally Unwanted Land Uses (LULUs): Case studies in Izmir
No Thumbnail Available
Date
2014-07
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Izmir Institute of Technology
Open Access Color
OpenAIRE Downloads
OpenAIRE Views
Abstract
Land use planning is both a technical and a political process in which many
different groups with multiple interests are affected by planning decisions. While every
land use planning decision has a potential of creating conflicts, Locally Unwanted Land
Uses (LULUs) are the most conflict facing subjects in urban land use planning because
of their negative externalities such as health effects, economic costs and harms to
environment. This thesis aims to find out the reasons of and solutions for the conflicts in
the planning processes of LULUs. The thesis focuses on conflicts about three LULU
types including solid waste facilities, fisheries and quarries in zmir, Turkey. Qualitative
research design is used with techniques including document analyses, media search and
in-depth interviews. In the case studies, the conflicts are analyzed with a proposed
analysis method including issues for understanding and resolving conflicts. These issues
are used to discuss characteristics and reasons of conflicts and existing and proposed
conflict resolution methods. It is found that the reasons of conflicts are not only the
negative effects of LULUs such as odor, pollution and noise but also procedural
deficiencies such as lack of knowledge and lack of trust. The findings in case studies
supported the theoretical works concerning limitations for the success of participatory
processes seeking for consensus. Conflict resolution attempts including symbolic
benefits rather than considering exact interests of local people should be rethought.
Description
Thesis (Doctoral)--Izmir Institute of Technology, City and Regional Planning, Izmir, 2014
Includes bibliographical references (leaves: 240-253)
Text in English; Abstract: Turkish and English
Full text release delayed at author's request until 2017.08.11
Includes bibliographical references (leaves: 240-253)
Text in English; Abstract: Turkish and English
Full text release delayed at author's request until 2017.08.11
Keywords
Locally Unwanted Land Uses, Land use planning, Planning process, Conflict resolution, Solid waste facilities, Fisheries, Quarries, Izmir