This is a Demo Server. Data inside this system is only for test purpose.
 

Analyzing the communication and coordination processes in Sabiha Gökçen International Airport's new terminal building wayfinding project

dc.contributor.advisor Doğan, Sevgi Zeynep en
dc.contributor.author Erbaşaranoğlu, Bengi
dc.date.accessioned 2023-11-13T09:28:03Z
dc.date.available 2023-11-13T09:28:03Z
dc.date.issued 2011 en
dc.description Thesis (Master)--İzmir Institute of Technology, Architecture, İzmir, 2011 en
dc.description Includes bibliographical references (leaves: 105-108) en
dc.description Text in English;Abstract: Turkish and English en
dc.description xiv, 162 leaves. en
dc.description.abstract Coordination is the third main function following design and construction in the building process. It is a sensitive managerial activity involving well-defined procedures and smooth flow of communication in all directions to achieve project objectives. This study builds on existing coordination theory and utilizes the four key coordination processes defined by Malone and Crowston (1994): (1) Managing shared resources (2) Managing producer-consumer relationship (3) Managing simultaneity constraints (4) Managing task/subtask dependencies. Four processes were interpreted and operationalized for the study of the e-mail data obtained from the wayfinding project coordination of new terminal building of Sabiha Gökçen International Airport. The organizational schema of the wayfinding project defined the e-mail communication analysis to be among the contractors, consultant and the design firm. Social network analysis is conducted for network centrality measures. Degree, betweenness and closeness centrality values are calculated for each project participant. There are three major findings from these analyses. First finding suggests that centrally positioned Wayfinding and Signage Design Project Contractor in the organization schema shows more coordination. Second finding suggests that task/subtask dependencies, producer-consumer relationship, simultaneity constraints and shared resources need respectively more coordination effort to manage in a wayfinding project. Third finding shows e-mail communication has a profound effect on coordination. The implications of these findings mean that companies involved in design and construction process may consider providing new approaches affecting dayto-to-day interactions depending on the power of new technological coordination mechanism. en
dc.identifier.uri http://standard-demo.gcris.com/handle/123456789/4162
dc.language.iso en en_US
dc.publisher Izmir Institute of Technology en_US
dc.rights info:eu-repo/semantics/openAccess en_US
dc.subject.lcsh Airport buildings en
dc.subject.lcsh Airport terminals en
dc.title Analyzing the communication and coordination processes in Sabiha Gökçen International Airport's new terminal building wayfinding project en_US
dc.type Master Thesis en_US
dspace.entity.type Publication
gdc.author.institutional Erbaşaranoğlu, Bengi
gdc.description.department Architecture en_US
gdc.description.publicationcategory Tez en_US

Files

Collections